Live server and live preview for HTML, CSS, JavaScript and PHP. Build and debug locally with live reload, HTTPS, API mocks and request inspection.
Installation
Launch VS Code Quick Open (Ctrl+P), paste the following command, and press enter.
Copied to clipboard
More Info

Auric Artisan Live — Live Server & Preview

Build your site. See it come alive.

Live server and live preview for HTML, CSS, JavaScript and PHP. Work on your website, backend and requests from one VS Code workspace — with live reload, HTTPS, API mocks and real-device testing.

v0.2.1 · 54 commands · 103 settings · English / हिन्दी · No runtime npm dependencies

Install from Marketplace · Website · Release notes

Auric Live workspace with project controls, request totals, live reload and network shaping

Actual extension UI rendered in a browser test harness. Screenshots use demonstration data, not performance benchmarks or an actual VS Code window.

Quick start · Workspace tour · Browser dashboard · Configuration · Troubleshooting

Quick start

English / हिन्दी

Choose Auto, English or हिन्दी in the Auric Live tab header. Your choice is saved globally in auricLive.interfaceLanguage. Auto follows VS Code's display language, including regional Hindi locales. Switching keeps the server running and retains the current section and request filters.

Auric Live टैब में स्वतः, English या हिन्दी चुनें। भाषा की पसंद सहेजी जाती है। स्वतः विकल्प VS Code की प्रदर्शन भाषा अपनाता है। भाषा बदलने से सर्वर बंद नहीं होता और वर्तमान टैब तथा अनुरोध फ़िल्टर बने रहते हैं।

The control panel, quick settings, Phone QR guidance and common host messages support Hindi. New preview tabs inherit the selected language; reopen an existing preview to update its toolbar. Command Palette and sidebar view labels follow VS Code's display language, not the panel override. Use Configure Display Language in VS Code to change those labels.

Technical setting descriptions, detailed diagnostics and messages without a Hindi translation fall back to English. The injected browser dashboard and the website being served are not translated. URLs, request/response content, commands and configuration values are never rewritten. Translation is bundled locally; no translation service receives your data.

Requires VS Code 1.95+ and a local website folder.

  1. Install Auric Artisan Live. For an exact match, search the Extensions view for @id:auric-artisan.auric-artisan-live; clear filters such as @installed.
  2. Open your project and run Auric Live: Go Live.
  3. Choose Open in browser or Preview beside in the Auric Live panel.
  4. Save your HTML, CSS or images. Connected pages update.

Start shortcut: Ctrl+Alt+L on Windows/Linux · Cmd+Alt+L on macOS.

Browser dashboard: Alt+Shift+D inside a served page.

The default port is 5500, with automatic port selection when configured. Save-only reload avoids reacting to every generated or synchronized file. Backend runtimes and framework packages must already be installed.

For machine-only access, set host to 127.0.0.1. The trusted-workspace default, 0.0.0.0, can also serve devices on your LAN, subject to firewall rules. Auric Live is a development server, not public production hosting.

Your development workspace

Five focused sections keep the important controls close to your project.

Section Use it to
Overview Start, stop or restart; choose a workspace; open previews; copy addresses; show phone QR; control reload and network shaping.
Requests Filter, sort and inspect traffic; pause the display; inspect captured details; copy curl/fetch; replay eligible requests; export HAR.
Runtime Choose detected or custom targets, check readiness and prerequisites, inspect output, or connect an existing backend.
Routing Configure proxy rules, mock endpoints, JSON REST collections and CGI handlers.
Settings Adjust typed session controls, open permanent project settings, or import an HTTPS certificate.

The panel adapts to narrow editor splits and light, dark and high-contrast themes. Auric OneDrop menus support keyboard navigation, type-ahead, selected states and focus restoration. Quick controls are session overrides; they do not silently rewrite your project configuration.

See the settings and custom dropdowns

Auric Live settings with session controls and an open OneDrop compression menu

Follow every request

Search by path, method, status or handler. Combine filters, sort by newest, slowest or largest, then open a request for the details that explain it.

Request inspector with combined filters, response status, handler, size and timing

  • Inspect on demand; live updates preserve your search field and cursor.
  • Pause the display while the server continues capturing traffic.
  • Copy curl/fetch, export redacted HAR, or replay eligible captures.
  • Keep traffic isolated between active workspace roots.
  • View inspector totals and a clearly labelled recent-request p95.

Use Ctrl/Cmd+F in Requests to focus search. Escape closes details and restores focus. The live panel is bounded to 200 rows; its latency sample is not a whole-session percentile.

See what your page is doing

Press Alt+Shift+D to open the browser dashboard over your served website.

Browser dashboard with development health, page metrics and delivery information

Overview, Network, Server, Storage, Environment, Requests and Console organize page health, timings, resource delivery, server state and diagnostics. Unsupported browser measurements are shown as unavailable; cache estimates are distinguished from server-confirmed results.

  • Pause or refresh metrics, navigate tabs by keyboard, and use an optional Auric cursor.
  • Scroll over content with the wheel or trackpad, or use arrows, Page Up/Down and Home/End.
  • Use Space/Shift+Space from focused content without taking over button activation.
  • Keep dropdown scrolling inside the menu; Escape dismisses the menu before the dashboard.
  • Keep dashboard styles and dropdown state isolated from the website in a Shadow DOM.
  • Run the dashboard independently when another framework owns hot reload.

Sampling is demand-driven and pauses with page visibility. Storage summaries do not read stored values. The dashboard makes no external font or branding requests.

Browser console and log controls

Browser console showing a single-border toolbar and the complete log-level dropdown

Console mirroring is off by default. Enable it explicitly and reload an already open page. Captured logs are bounded, rate-limited and sanitized, with level filters and copy/clear controls. Original console behavior is preserved.

Test on the device that matters

Open Phone QR directly in the Auric Live tab. Scan the locally generated code, or copy its address, to open the same served site on your phone.

Inline phone QR card with a demonstration LAN address and connection guidance

Keep your phone and computer on the same network and allow the connection through your firewall. QR codes clear when a server stops or its address changes. No address is sent to a QR service.

The editor preview also offers device presets, custom viewport sizes, rotation, scaling, reload and browser handoff. Use a real device to check behavior beyond the preview's simulated dimensions.

HTTPS is encrypted, but certificate trust is separate. Generated certificates do not install trust on your computer or phone. Each client must trust the certificate or its issuer. Imported pairs are checked for matching keys and validity dates; import-dialog passphrases remain session-only.

Serve the front end. Connect the backend.

Capability What is supported
Static serving Clean URLs, SPA fallback, custom index/404 pages, directory listings and MIME overrides.
Efficient delivery Range and conditional requests, ETags, gzip/Brotli compression and cache policies.
Live reload Save-only, filesystem-change or manual modes; CSS/image hot swap; scroll restoration; storm protection.
Runtime management Detected/custom commands, port discovery, bounded output, readiness checks and crash restart/backoff.
Existing services URL-only profiles and backend discovery without launching or terminating the adopted service.
Proxy HTTP/HTTPS routing, rewrites, headers, optional HTML injection and WebSocket forwarding.
Mock API Method/path/query matching, configured status, headers, delays and response bodies/files.
JSON REST CRUD collections, filtering, sorting, pagination and optional persistence.
PHP/CGI Installed executables, configurable handlers and execution timeouts in trusted workspaces.
Network testing Slow-3G, 3G, 4G, cable and custom latency/upload/download pacing for supported HTTP transfers.

Runtime detection covers common Node.js/package-script workflows and families including PHP, Python, Ruby, Deno, Bun, .NET, Java, Go and Rust. Detection suggests a target; it does not install tools or guarantee every framework configuration.

The upstream monitor waits for readiness before forwarding requests and can reload pages after recovery. Use a health path for application-level readiness, or leave it empty for TCP availability. Diagnostics are read-only.

Custom profiles support command lines, working directories, environment variables, shell executables and ports. Unrelated configuration changes preserve API routes, session settings and in-memory REST data.

Configuration

Precedence is: built-in defaults → VS Code settings → project config → session overrides. VS Code setting names have the prefix auricLive.; project-file names do not.

Create auric.live.json in the workspace:

{
  "host": "127.0.0.1",
  "port": 5500,
  "open": "none",
  "liveReload": {
    "enabled": true,
    "reloadOnSave": "save",
    "cssHotSwap": true,
    "preserveScroll": true
  },
  "dashboard": {
    "enabled": true,
    "independent": false
  },
  "proxy": [
    { "path": "/api", "target": "http://localhost:3000" }
  ],
  "inspector": {
    "sensitiveFields": ["customerPin"],
    "harIncludeBodies": false
  }
}

For supervised runtimes, URL-only backends, custom network profiles and additional privacy controls, see Advanced testing and diagnostics.

Use Create Config File for a generated configuration example. .auricignore-live controls project-specific exclusions; .auric-live/ holds optional local diagnostic session records and is reserved from serving.

Privacy and deliberate limits

Common credential headers, sensitive query parameters and JSON/form fields are redacted before inspector storage by default. Configure additional field names for your application. Arbitrary personal information or secrets embedded in free-form text may still require manual removal.

HAR excludes bodies by default. Review exports before sharing. Requests with redacted, omitted or truncated input cannot be safely replayed; copy a snippet and supply the missing data manually. Non-read replay methods require confirmation.

Safeguard / constraint Default or behavior
Request inspector 500 stored entries; panel displays the newest 200
Captured body 256 KiB per body
Incoming request body 8 MiB; larger bodies receive 413; zero rejects non-empty bodies
Body receive timeout 30 seconds; stalled bodies receive 408
Browser console Off; when enabled, 200 entries, 2,000 characters/message and 20 messages/second
Diagnostic records Enabled locally; up to 200 request summaries, 12 sessions and approximately 5 MiB/session
Network shaping Per transfer, not a shared bandwidth budget or packet-loss emulator; WebSocket frames are not bandwidth-shaped
Workspace trust Untrusted project files cannot enable runtime execution, proxying, CGI, file-backed mocks or public listening
Runtime dependencies Executables and framework packages must already be installed
Platform coverage Automated tests do not certify every operating system, framework or actual VS Code installation
Hosting Development only; virtual workspaces are unsupported

Resource limits are configurable where appropriate. Bounded memory, privacy protections and workspace trust remain deliberate safeguards for local development.

Commands

Browse all 54 commands and their identifiers

This inventory comes from the extension manifest. All commands use the Auric Live category.

Command Identifier
Select Active Server auricLive.selectServer
Toggle Browser Console Capture auricLive.toggleConsole
Use HTTPS Certificate and Key auricLive.configureCertificate
Diagnose Project and Runtime auricLive.diagnose
Go Live auricLive.goLive
Stop Server auricLive.stop
Stop All Servers auricLive.stopAll
Restart Server auricLive.restart
Serve This Folder auricLive.startHere
Open with Auric Live auricLive.openWithLive
Open in Default Browser auricLive.openInBrowser
Open Preview Beside auricLive.openPreview
Copy Local URL auricLive.copyUrl
Copy Network URL auricLive.copyNetworkUrl
Show Phone QR Code auricLive.showQrCode
Open Control Panel auricLive.openControlPanel
Open Request Inspector auricLive.openInspector
Clear Request Log auricLive.clearRequests
Export Requests as HAR auricLive.exportHar
Copy Request as curl auricLive.copyAsCurl
Copy Request as fetch auricLive.copyAsFetch
Replay Request auricLive.replayRequest
Show Request Detail auricLive.showRequestDetail
Create Project Config File auricLive.createConfigFile
Open Project Config File auricLive.openConfigFile
Open .auricignore-live auricLive.openIgnoreFile
Open Recorded Live Session auricLive.openRuntimeRecords
Reload Configuration auricLive.reloadConfig
Change Port… auricLive.changePort
Change Served Folder… auricLive.setRoot
Toggle Live Reload auricLive.toggleLiveReload
Toggle Mock API auricLive.toggleMocks
Toggle HTTPS auricLive.toggleHttps
Simulate Network Profile… auricLive.setThrottle
Reveal Development Certificate auricLive.revealCertificate
Open Settings auricLive.openSettings
Show Log auricLive.showLog
Reload Connected Pages auricLive.reloadBrowsers
Resume Live Reload auricLive.resumeLiveReload
Start Framework Dev Server… auricLive.startDevServer
Stop Framework Dev Server auricLive.stopDevServer
Restart Framework Dev Server auricLive.restartDevServer
Show Dev Server Output auricLive.showDevServerLog
Find a Running Backend auricLive.detectBackendPort
Select Run Target… auricLive.selectRunTarget
Add Custom Run Command… auricLive.addRunProfile
Edit Saved Run Commands auricLive.editRunProfiles
Show Detected Run Targets auricLive.showRunTargets
Add API Proxy Route… auricLive.addProxyRoute
Add Mock API Route… auricLive.addMockRoute
Open Mock Database auricLive.openMockDatabase
Refresh auricLive.refresh
Open Live Menu auricLive.openMenu
Focus Auric Live auricLive.focus

Build and verify

Development setup, automated tests and release checks

Use a current Node.js version compatible with the development tools; this release was verified on Node 24.

npm ci
npm run check
npx playwright install chromium
npm run test:ui
npm audit
npm run package

npm run check validates the manifest, registrations, settings, CSP, source syntax, dropdown contracts, assets and package exclusions, then runs unit and integration tests. Coverage includes real HTTP/TLS, proxy/mock/REST/CGI, reload behavior, runtime processes, privacy, network pacing and stubbed VS Code activation.

npm run test:ui runs the shipped webview in a real headless Chromium browser with a deterministic VS Code bridge and no external website requests. It checks layout, keyboard controls, filter focus, sorting/pagination, pause/resume, request-detail safety, settings actions and workspace state. Screenshots go to test/artifacts/.

On a machine with Edge already installed, PowerShell can use it without downloading another browser:

$env:AURIC_BROWSER_CHANNEL = "msedge"
npm run test:ui

The browser suite is separate from the package prepublish gate because it requires an installed browser. Prepublish runs the core check automatically. Local process tests must be allowed to terminate their own temporary child processes.

For a release, also install the VSIX into a development VS Code profile and smoke-test real editor webview messaging, trust prompts, remote scenarios and phone certificate trust. A browser fixture is not an actual VS Code extension-host end-to-end test.

Troubleshooting

  • No live update: confirm reload is enabled, the selected trigger matches your workflow, and the file is not excluded. Use Reload pages for a manual check.
  • Repeated refreshes: use the default save-only trigger and inspect reload-storm diagnostics before enabling raw filesystem watching.
  • Backend unavailable: run diagnostics, inspect runtime output and verify the configured port/health path. HTTP readiness probes do not follow redirects.
  • Phone cannot connect: check the LAN address, host binding, shared network and firewall. Trust HTTPS separately on the phone.
  • Empty or expired details: the request may have left the bounded inspector or capture may be disabled. Make a fresh request.
  • Session setting reverted: write the permanent choice to the project config or VS Code settings.

See CHANGELOG for release changes and LICENSE for terms.

  • Contact us
  • Jobs
  • Privacy
  • Manage cookies
  • Terms of use
  • Trademarks
  • Your Privacy Choices
  • Consumer Health Privacy
© 2026 Microsoft