Skip to content
| Marketplace
Sign in
Visual Studio Code>Programming Languages>LaTeX DeskNew to Visual Studio Code? Get it now.
LaTeX Desk

LaTeX Desk

Esquared Systems

|
40 installs
| (0) | Free
All the LaTeX power, none of the setup, and no limits on your builds. Build, preview, fix your bibliography and export for submission, all inside Visual Studio Code.
Installation
Launch VS Code Quick Open (Ctrl+P), paste the following command, and press enter.
Copied to clipboard
More Info

LaTeX Desk logo

LaTeX Desk

All the LaTeX power, none of the setup, and no limits on how long your build can run.
Write, build, preview and submit LaTeX documents without leaving VS Code.

Marketplace version Installs AGPL-3.0 license

LaTeX Desk: source, toolbars and the PDF side by side

  • Your machine, your rules. Builds run on your own TeX installation, so a 250-page thesis compiles as often as you like, with no queue, no timeout and no file-size cap.
  • Nothing to configure. LaTeX Desk finds your main file, picks a recipe and opens the PDF beside the source on the first build.
  • Private by design. Everything works offline, and your documents never leave your computer (privacy).

Write, save, see it

Save and the PDF rebuilds, keeping your place, and extra passes run only when they're needed. Ctrl+click (Cmd+click on macOS) anywhere in the PDF to jump to the line that produced it, or press Ctrl+Alt+J to go the other way.

Saving rebuilds the PDF; Ctrl+click in the PDF jumps to the source

Formatting without memorising commands

The LaTeX Tools bar gives you one-click bold, italic, alignment and text size, an equation builder and a searchable symbol palette. Buttons work as toggles: click Bold on \textbf{word} and it is plain again. If a button needs a package you haven't loaded, LaTeX Desk offers to add it.

Making a word bold and building a formula from the toolbar

Errors explained in plain English

Every error and warning appears in the Problems view with its file and line. The log viewer explains common ones: what went wrong, the usual causes and what to try. One click takes you to the line.

The log viewer explaining an undefined control sequence

A bibliography you can trust

The Bib Manager checks every entry as you type: missing fields, broken DOIs, uncited and duplicate entries. It scores each entry for completeness and walks you through the fixes one at a time.

Bib Manager triage: issues grouped by rule with one-click fixes

Bibliography health report with a score per entry

Tables without the ampersands

Put the cursor in a table and open the Table Wizard: edit cells in a grid, add or remove rows and columns, and set alignment, caption and label. You can also paste straight from a spreadsheet or import a CSV.

The table wizard editing an existing booktabs table

Ready to submit

Export for Submission packages only the files your document actually uses, adds the .bbl, can strip comments, and then compiles the copy in a clean folder. You know the upload works before you send it. Presets cover arXiv, journals and a source ZIP.

Two one-click helpers sit in the Build view:

  • Create Source ZIP packs every source file of the project (figures, .bib, .cls, .sty, data) into one archive for a publisher or co-author, and leaves out the compiled PDF and all build files. Verify compiles the archive's contents in a clean folder.
  • Export PDF with Watermark… writes a copy of the built PDF with DRAFT (or any text) across every page, or in the top or bottom margin. Your PDF and your sources are not changed.

Export for submission with the arXiv preset

Your project at a glance

The dashboard shows the build state, errors, bibliography health, word count, TODOs and anything blocking submission. The side bar lists your document's structure, files, citations, labels and history.

Project dashboard and the LaTeX Desk side bar

Hover over any formula to see it rendered, without building:

Hovering over an equation shows a rendered preview


Getting started

  1. Install a TeX distribution if you don't have one: MacTeX (macOS), MiKTeX or TeX Live (Windows), or TeX Live (Linux). Run LaTeX Desk: Check LaTeX Tools to confirm what was found.
  2. Open the folder that contains your .tex files.
  3. Open your main file and press Ctrl+Alt+B (Cmd+Alt+B on macOS). The PDF opens beside the source, and every save rebuilds it after that.

Starting fresh? Create from Template… (in the Build view) opens a searchable library of journal, conference, thesis, book, slide, poster, CV and letter templates: type ieee, apa, thesis or a subject, pick one, and choose a folder. Templates that publishers only offer from their own site link there, and you can create the project from the ZIP you download. New LaTeX Project… asks a few quick questions (class, engine, bibliography, layout) instead.

Editing, completion and all the checks work without TeX installed; only building needs it. latexmk is used when present (it ships with all three distributions). Optional extras: latexindent or tex-fmt for formatting, latexdiff for change-tracked PDFs, texcount for a second word count.

LaTeX Desk finds the main document by itself. A % !TEX root = ../main.tex comment wins; otherwise it picks the file that has \documentclass and includes the file you are editing. If several documents qualify, it asks once. Select Root Document changes the choice later.

Everything included

Area What you get
Build latexmk, pdfLaTeX, XeLaTeX, LuaLaTeX, Tectonic or your own recipe; build on save; stop; clean; separate output folder; extra passes only when needed
Faster builds Build This Chapter Only for \included chapters, and a draft-image fast preview for figure-heavy documents (measurements)
PDF viewer Zoom, fit, page layouts, search, outline, links, dark pages; keeps your place across rebuilds and never shows a half-written PDF
SyncTeX Forward and reverse search, built in, across included files and output folders
Language Completion for commands, environments, citations, labels, packages and files; hovers for citations, labels, images and math; go to definition; find references; rename labels, keys, commands and environments with a preview
Editing Toolbars, snippets, insert, wrap, close and rename environments, \[…\] ↔ equation, automatic \item on Enter, table wizard
Checks Unmatched environments, duplicate labels, packages loaded twice (in red, with a fix), undefined references and citations, obsolete commands, as you type
Spelling Offline, prose only (commands, math, labels and the preamble are skipped), US and UK English, project and personal dictionaries
Bibliography Checker with rule codes and a completeness score, quick fixes, Bib Manager (table, triage, health report), entry form, citation search, command-line checker for CI
History Snapshots after each successful build, labelled versions, diff and restore, and a latexdiff PDF against any snapshot
Export arXiv, journal and source-ZIP presets; only used files; optional flattening and comment stripping; test compile of the exported copy; watermarked copy of the PDF
Templates Create from Template: an online library of starter and publisher templates with instant search and type filters; works offline from the last download

Word counts and math previews are approximations and say so.

Keyboard shortcuts

Command Windows / Linux macOS
Build project Ctrl+Alt+B Cmd+Alt+B
Fast preview build Ctrl+Alt+Shift+B Cmd+Alt+Shift+B
View PDF Ctrl+Alt+V Cmd+Alt+V
Show position in PDF Ctrl+Alt+J Cmd+Alt+J
Stop build Ctrl+Alt+X Cmd+Alt+X
Clean auxiliary files Ctrl+Alt+C Cmd+Alt+C
Insert environment Ctrl+Alt+E Cmd+Alt+E
Wrap selection in environment Ctrl+Alt+W Cmd+Alt+W
Insert citation Ctrl+Alt+[ Cmd+Alt+[
Close current environment Ctrl+Alt+] Cmd+Alt+]

Every command is in the Command Palette under LaTeX Desk. In the PDF, Ctrl+click (Cmd+click) jumps to the source; set latexdesk.viewer.reverseSyncClick to use double-click instead.

Settings

Settings are under LaTeX Desk in the Settings editor. The ones you are most likely to change:

Setting Default Meaning
latexdesk.build.autoBuild onSave never turns off building on save
latexdesk.build.recipe latexmk (pdf) Default recipe
latexdesk.build.outDir (empty) Output folder relative to the root, e.g. build
latexdesk.rootFile (empty) Fix the root document instead of detecting it
latexdesk.bib.profile standard minimal, standard or strict field expectations
latexdesk.spell.language en_US Dictionary; a file can choose with % !TeX spellcheck = en_GB
latexdesk.format.tool builtin latexindent or tex-fmt instead of the built-in formatter
latexdesk.toolbar.enabled true Editor title bar buttons; latexdesk.toolbar.showMiniBar controls the LaTeX Tools bar
latexdesk.watermark.opacity 0.15 Opacity of the watermark text
latexdesk.network.enabled true Set to false to stop every download (the template library is the only network feature)
Your own tools and recipes
"latexdesk.build.tools": [
  { "name": "glossaries", "command": "makeglossaries", "args": ["%DOC%"], "cwd": "%OUTDIR%" }
],
"latexdesk.build.recipes": [
  { "name": "pdflatex + glossaries", "tools": ["pdflatex", "glossaries", "pdflatex"] }
]

Placeholders: %DOC% (root without extension), %DOCFILE%, %DOC_EXT%, %DIR% (root folder), %OUTDIR%, %PATHSEP%. Tools run directly, never through a shell. A file can pick a recipe with % !LS recipe = pdflatex + glossaries, or a program with % !TEX program = xelatex.

Bibliography rules and the command-line checker

Problems are reported with a code such as bib/missing-required or bib/invalid-doi. Each entry gets a completeness score:

score = 70 × (share of required fields present)
      + 20 × (share of recommended fields present, per profile)
      + 10 × (1 − 0.25 × number of value problems, at least 0)

To silence a rule for one entry, put a comment above it: % bib-ignore: missing-doi. To change a rule everywhere: "latexdesk.bib.rules": { "bib/missing-doi": "off" }. The full list is in docs/bibliography-rules.md.

The same checker runs on the command line, for CI or a pre-commit hook:

npx latexdesk-bibcheck references.bib --tex main.tex --profile strict --format sarif --fail-on warning
Files LaTeX Desk writes
  • Build output next to your root document (or in latexdesk.build.outDir), written by TeX.
  • .latexdesk/ next to the root: fast/ and partial/ builds, history/ snapshots, snapshots/ (a copy of an existing PDF before the first build overwrites it), diff/, and dictionary.txt (project words). It has its own .gitignore; commit dictionary.txt if you want to share project words.

Your .tex and .bib files change only when you edit them or accept an action (quick fix, rename, table wizard, restore), always through VS Code, so Undo works.

Known limitations

  • Fast preview and partial builds need latexmk; partial builds work for \included files only.
  • Not in this release: a visual (rich-text) editor, review comments and tracked changes, Zotero, online metadata lookup (DOI, arXiv) and real-time collaboration.
  • Spell checking ships with English dictionaries; add others with latexdesk.spell.dictionaryPath. Language switches inside a document (\selectlanguage) and words with TeX accents (M\"uller) are not checked yet.
  • Very large projects may notice indexing, which runs on the extension host thread (details).

Found a bug or missing feature? Open an issue.

Contributing

Want to work on LaTeX Desk itself? See the developer guide, README_DEV.md.

License

Copyright (C) 2026 eSquared Systems.

LaTeX Desk is free software: you can redistribute it and/or modify it under the terms of the GNU Affero General Public License as published by the Free Software Foundation, either version 3 of the License, or (at your option) any later version. See LICENSE.

In short: you may use LaTeX Desk for any purpose, including at work. If you distribute a modified version, or offer one to others over a network (for example in a hosted editor), you must make its complete source available under the same license.

Versions up to and including 0.3.0 were released under the MIT license and remain available under it.

The thesis in thesis/ (used only for testing in this repository, not shipped in the extension) is licensed separately under CC BY-NC-ND 4.0; see thesis/LICENSE.

Included software and data

Component License Used for
pdf.js 4.10.38 Apache-2.0 PDF viewer
MathJax 3.2.2 Apache-2.0 Math previews in hovers
nspell 2.1.5 MIT Spell checking
JSZip 3.10.1 MIT (dual MIT/GPLv3, used under MIT) ZIP export and template extraction
pdf-lib 1.17.1 MIT Watermarked PDF copies
Papa Parse 5.5.3 MIT CSV/TSV import in the table wizard
tree-kill 1.2.2 MIT Stopping builds with all child processes
English dictionaries en_US, en_GB (dictionary-en, from SCOWL) MIT AND BSD Spell checking; license files ship in dist/dictionaries/

The command list, symbols, error explanations, snippets and BibTeX/BibLaTeX field tables in data/ and snippets/ were written for this project (the field tables follow the BibTeX and BibLaTeX documentation) and are under the project's license (AGPL-3.0-or-later).

  • Contact us
  • Jobs
  • Privacy
  • Manage cookies
  • Terms of use
  • Trademarks
  • Your Privacy Choices
  • Consumer Health Privacy
© 2026 Microsoft