Skip to content
| Marketplace
Sign in
Azure DevOps>Azure Boards>Rich Date Field Control Mid-Day
Rich Date Field Control Mid-Day

Rich Date Field Control Mid-Day

YoavLax

|
162 installs
| (1) | Free
Date Control, with range and visualisation
Get it free

Rich Date Control

Hi there! This extensions is a fix to the original one by AviHadad. PR: (https://github.com/avih75/AzureDevops_Rich_Date_Field_Control/pull/12)

It sets the hour to Mid-Day instead of Mid-Night which causes issues between countries in certain hours.
Solving the following issues: https://github.com/avih75/AzureDevops_Rich_Date_Field_Control/issues/8 https://github.com/avih75/AzureDevops_Rich_Date_Field_Control/issues/9 https://github.com/avih75/AzureDevops_Rich_Date_Field_Control/issues/13 In addition, solving Dark-Mode background issue.

Features

Date display

Displaying date only, without time
Layout Customization

Relative Selection Range

Layout Customization
The selection can be ranged between two range-dates.
Each range-date can be relative to a range-anchor-date (+- days)
The range-anchor-date can be either now, another date control in the work item.

For example:

  • Two weeks window (Relative Range between Now-7 and Now+7)
  • Dynamic range between CreatedDate to DueDate (custom)

Visualization out of range

Layout Customization

The control visualize by message when the date selected is out of range (when rage changes by the anchor).

Target State Date Visualization

Layout Customization
The control color visualize work item state target
For example:

  • Color red when date passed and state Is Not one of "New" (On StartDate)
  • Color red when date passed and state Is one of "New","Fixed", "Resolved" (On DueDate)

Configuration

General

  • Date Field : (work item field) that will contain the date (short date)

Relative Selection Range

  • Range Start Anchor : (work item field) optional, if you want to set the start of range reference to other date field. Default, now.
  • Range Start Anchor stretch : (number postive/negative) optional, you can set a number of day to stretch / relax from the Range Start Anchor. Default, 0.
  • Range End Anchor : (work item field) optional, if you want to set the start of range reference to other date field. Default, now.
  • Range End Anchor stretch : (number postive/negative) optional, you can set a number of day to stretch / relax from the Range End Anchor. Default, 0.

Target Status Date Visualization

  • Status Target : (string, array of System.Status) optional. Target this statuses and color accordingly.
  • Status Condition : (Is/IsNot one of) optional, track if in the System.Status Is / Is Not one of given values.

Installation:

Layout Customization

Layout Customization

Layout Customization

  • Contact us
  • Jobs
  • Privacy
  • Manage cookies
  • Terms of use
  • Trademarks
© 2025 Microsoft