Skip to content
| Marketplace
Sign in
Azure DevOps>Azure Boards>How cool we are!
How cool we are!

How cool we are!

Szoke Tamas

|
2,052 installs
| (7) | Free
Pie chart that shows the count of RQs that has modified by the team within the current sprint
Get it free

Modified WorkItem Count Chart

This extension enable to add pie chart to the dashboard that shows the workitems that has been modified within the current sprint or the given time frame.

Getting Started

  1. Install the extension
  2. Add the widget to the dashboard.
  3. Go to the configuration page
  4. Perform the initial configuration

Prerequisites

The project iteration dates needs to be configured.

Configuration

Show current iteration: If the Show current iteration checkbox is checked then the chart will shows only the current iteration. If not then we get datetime combo boxes for selecting the proper interval.

Show all modification If the "Show all modification" checkbox is not checked then it will shows only the workitems that are on review or not assigned to our team.

WorkItems DropDown We can select all workitem types that we want to see.

Versioning

Please see the ReleaseNotes file for details

Authors

  • Tamas Szoke (SzokeT)

License

This project is licensed under the MIT License - see the LICENSE.md file for details

  • Contact us
  • Jobs
  • Privacy
  • Manage cookies
  • Terms of use
  • Trademarks
© 2025 Microsoft